Installation and DIY for an outdoor cabinet run: levelling, bolting modules together, what a licensed trade must do, and the order that avoids a visible step.

The short answer

Cabinets arrive assembled on castors. Installation is placing, bolting, levelling and setting the top — a half day for three modules, and no carpentry.

People
2
Time
Half a day / 3
Tools
Spanner, level
Licensed
Gas + electrics
Two outdoor cabinet modules being joined with connecting screws along the inside of the carcass frames
Render — a BOGEQI order visualisation, not a photograph of a finished site BOGEQI order archive

Read in this order

Start here

The rest of the category is variations on these. Each answers one question rather than listing trends.

Guides in this section

The full list

Newest first. Each guide answers one question and links to the cabinet, drawing or report that settles it.

2026 · 10

Levelling a cabinet run — across the run, not per cabinet

A 2 mm tolerance over 3 m, and why individual cabinets can each be level and still be wrong.

Levelling

Before you read the guides

The order that avoids a visible step

These are the decisions the guides below keep returning to. Settle them roughly first; the articles then fill in the detail.

  1. Set the run out on the floor first

    Mark the module sequence on the ground before anything is unpacked. A run assembled by eye ends up with the joints in the wrong place.

  2. Roll each module into position

    Every module arrives on braked castors. Two people, one at each end, and nothing is lifted further than the kerb.

  3. Bolt module to module

    The connecting screws pull the carcasses together. The countertop hides the seam; it does not hide a gap, so this is the step that gets checked.

  4. Level the whole run as one unit

    Adjust the castors after the run is bolted, then brake them all. Levelling module by module before bolting is the mistake that shows at the top.

  5. Hand the services to a licensed trade

    Gas, a new electrical circuit and the final water connection are local licensed work. The cabinet leaves the vent cut and the power point accessible.

Straight answers

Questions this section gets most

If the answer you need is not here, the enquiry form asks for the grill model and the run length and nothing else.

How many people does it take?

Two for anything 800 mm wide or larger, and a third helps on a corner module. A 400 mm module can be handled by one person.

Does the run need fixing to the wall?

No. The run is freestanding on braked castors. It is not fixed to the wall, which is also why it can be moved for cleaning.

What must a licensed trade do?

The gas connection, any new electrical circuit, and the final water and waste connection. We do not ship or arrange that work.

Save the reading

Send us the grill and the length

One field, then a configuration and a price. If your grill is one we have not cut for, we will ask for the manufacturer's drawing rather than guess at it.

Page last updated · Reviewed by the BOGEQI technical team, Foshan Bogeqi Cabinetry Co., Ltd.

Reference

The heights you are working to

Levelling is easier once you know which of these four numbers is allowed to move. Only the castors adjust.

Finished height
900 mm
Body height
790 mm
Castor and plinth
90 mm
Module depth
656 mm